After working on the dozer starter for a day and a half, I was able to get most of the 2x2 spacer boards the shiplap attaches to installed.
I have a couple more to go on the lower end of the ceiling. After all the lower boards are on I need to add another section of scaffolding to reach the peak of the ceiling, then the insulation and ship lap and paint. If the weather holds on my every other week schedule I may get the ceiling done before the snow makes me stop up there until May next year when the snow melts again. I have some more dirt work outside I would like to finish this year also. Fells good to be able to get back to work up there, the last couple years I haven't done much there due to work load at home, I retire next spring and then I can hit it even harder with longer stays there. If I have time I can make a winter trip in the track van, but in the winter we just play up there. Its too hard to to haul much material in.
I have a couple more to go on the lower end of the ceiling. After all the lower boards are on I need to add another section of scaffolding to reach the peak of the ceiling, then the insulation and ship lap and paint. If the weather holds on my every other week schedule I may get the ceiling done before the snow makes me stop up there until May next year when the snow melts again. I have some more dirt work outside I would like to finish this year also. Fells good to be able to get back to work up there, the last couple years I haven't done much there due to work load at home, I retire next spring and then I can hit it even harder with longer stays there. If I have time I can make a winter trip in the track van, but in the winter we just play up there. Its too hard to to haul much material in.