A recipie for a major mess:
Take one brand new building of approximately 10,500 sq feet.
Add about 25' of ground around the perimiter of topsoil and aglime (all the grass has been destroyed by equipment).
Add a trench along the length of the building for water and electric service (the trench is filled thankfully).
Now toss in approximately 4" of rain in the last two days.
NOW YOU HAVE A MAJOR MESS ON YOUR HANDS!
grumble, grumble, grumble, grumble.
Take one brand new building of approximately 10,500 sq feet.
Add about 25' of ground around the perimiter of topsoil and aglime (all the grass has been destroyed by equipment).
Add a trench along the length of the building for water and electric service (the trench is filled thankfully).
Now toss in approximately 4" of rain in the last two days.
NOW YOU HAVE A MAJOR MESS ON YOUR HANDS!