loboloco
Well-known member
Mak, shut up.
this is how my day went. I picked up a van about 1030 hrs. Removed a wheelchair lock, photoing the wire pattern, then removing a plywood floor some idiot had soaked with hydraulic fluid. Clean van to remove all excess oil. Cut, drill and replace floor (3/8 inch A/C ply) re-wire and re-install lock for wheel chair. Re-installing lock required me to drop the fuel tank about 3 inches because of bolt position. Clean and deliver van. Parts, 30.00, pickup and deliver van, 30.00. Labor 3 hrs at 30.00/hr. Now I am hurting from a combo of sun poisoning and overheating. Fortunately, beer helps.
this is how my day went. I picked up a van about 1030 hrs. Removed a wheelchair lock, photoing the wire pattern, then removing a plywood floor some idiot had soaked with hydraulic fluid. Clean van to remove all excess oil. Cut, drill and replace floor (3/8 inch A/C ply) re-wire and re-install lock for wheel chair. Re-installing lock required me to drop the fuel tank about 3 inches because of bolt position. Clean and deliver van. Parts, 30.00, pickup and deliver van, 30.00. Labor 3 hrs at 30.00/hr. Now I am hurting from a combo of sun poisoning and overheating. Fortunately, beer helps.